Qualification and calibration in a greenfield project at a well-known vaccine manufacturer
Testo Industrial Services carried out the entire qualification process for the customer - from the planning of the various qualification stages to their processing and execution of the qualification measurements.
The plant is the "Center of Excellence" for cell culture-based vaccines and viral vaccines for this renowned customer from the pharmaceutical industry. The main products produced at the site are influenza vaccines, tetanus/pertussis/diphtheria/rabies vaccines and vaccines against tick-borne encephalitis (tick-borne meningoencephalitis): TBE produced.
The aim of the "Greenfield Project" was to carry out qualification and calibration activities at a wide variety of plants and measuring points with a high degree of flexibility. Testo Industrial Services was commissioned for all activities from the preparation of plans for the qualification stages (user requirements/measurement point risk analyses/risk analyses of process plants/Part11 analyses/DQ/FAT/SAT/IQ/OQ/PQ) to their processing and execution of the qualification measurements.
Your advantage: Our competence
- Qualification of production buildings and media supply:
Ventilation systems, clean rooms, dishwashers, autoclaves, production tanks (lines), storage tanks, WFI and PUW, egg locks, incubators, refrigerators and freezers, incubators, refrigerators and freezers, scales, PH measuring equipment, hose welders, LF benches. - Qualification Warehouse:
Incubators, refrigerators and freezers, air-conditioning and storage rooms, high-bay warehouse - Qualification of QC Labs:
Autoclaves, dishwashers, incubators, refrigerators and freezers, incubation, refrigeration and storage rooms, isolators, various equipment (including scales, LF benches, egg incubators, fault indicator room). - Calibration production plants
- Calibration media supplies
- Warehouse calibration
- Calibration of the quality control laboratories
The result
Testo Industrial Services met the special challenges of a greenfield project in terms of project planning, project execution and resource planning to a high degree. Particularly due to the high overall competence, the multi layered qualification and calibration activities at various plants and measuring points could be implemented in a project-adapted manner.
Qualification of plants and utilities
Risk-based qualification of air handling units, process gases, sterilizers, water and water systems
Cleanroom qualification
Security and compliance for your cleanrooms
On-site calibration
Overcoming distances and reducing downtimes